CELADON CITY (BLOCK A7, D & E)

  • Vị trí dự án Tan Phu District, Ho Chi Minh City
  • Client Gamuda Land (HCMC) Joint Stock Company
  • Package Construction and full finishing of the entire project
  • Tổng diện tích sàn xây dựng (CFA) 120,000 m²
  • Implementation time 02/2016 – 04/2018
12
Above-ground floors
01
Basement
Project information

The Celadon City (Block A7, D & E) project, developed by Gamuda Land (HCMC) Joint Stock Company, is located in Tan Phu District, Ho Chi Minh City.

The building consists of 01 basement and 12 above-ground floors, with a total floor area of 120,000 m². It forms an important part of the modern Celadon City urban complex.

Phuoc Thanh undertook the construction and full finishing of the project from 02/2016 to 04/2018, contributing to the creation of a high-quality, well-planned, and premium living space in the western area of Ho Chi Minh City.

Other projects

DESTINO CENTRO
DESTINO CENTRO
Phuoc Thanh Construction undertakes basement, ground floor structural works, finishing, MEPF systems, and landscape infrastructure for the Destino Centro – My Yen Project (20 floors, total floor area 149,912.85 m²) in Ben Luc, Long An; commenced in August 2024 and scheduled for completion in September 2026.
FIATO AIRPORT CITY
FIATO AIRPORT CITY
Phuoc Thanh Construction executes structural and finishing works for the Fiato Airport City Project (02 towers, 786 apartments, total floor area 68,773 m²) in Nhon Trach, Dong Nai; commenced in May 2024 and scheduled for completion in June 2026.
TTC PLAZA DUC TRONG SHOPPING CENTRE
TTC PLAZA DUC TRONG SHOPPING CENTRE
Phuoc Thanh acted as general contractor for the TTC Plaza Duc Trong Shopping Centre—a 5-storey commercial building with a floor area of 10,000 m² in Duc Trong District, Lam Dong Province—commenced in May 2018 and completed in March 2019, contributing to the growth of commerce and services while enhancing the local urban landscape.
SAIGON-AVENUE
SAIGON-AVENUE
Phuoc Thanh carried out the construction of the foundation, basement, and superstructure for the Saigon Avenue project – comprising 01 basement, 26 above-ground floors, and a total floor area of 46,200 m² in Thu Duc District, Ho Chi Minh City; commenced in 02/2018 and completed in 01/2019.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.