WILTON TOWER – COMMERCIAL & RESIDENTIAL BUILDING
WILTON TOWER – COMMERCIAL & RESIDENTIAL BUILDING
Phuoc Thanh executed the construction and finishing of Wilton Tower – a 24-storey, 1-basement residential tower with a total floor area of 65,000 m² in Binh Thanh District, Ho Chi Minh City; commenced in 03/2017 and completed in 06/2018.
C.P BEN TRE ANIMAL FEED FACTORY
C.P BEN TRE ANIMAL FEED FACTORY
The C.P Ben Tre Animal Feed Factory – with a 15,000 m² main workshop constructed by Phuoc Thanh in Chau Thanh District, Ben Tre – meets modern aquatic feed production standards and contributes to local economic development.
SAIGON-AVENUE
SAIGON-AVENUE
Phuoc Thanh carried out the construction of the foundation, basement, and superstructure for the Saigon Avenue project – comprising 01 basement, 26 above-ground floors, and a total floor area of 46,200 m² in Thu Duc District, Ho Chi Minh City; commenced in 02/2018 and completed in 01/2019.
IJC AROMA HIGH-END APARTMENT – BECAMEX IJC – BINH DUONG
IJC AROMA HIGH-END APARTMENT – BECAMEX IJC – BINH DUONG
Phuoc Thanh undertook the new-build construction for Block A and Block B of the IJC Aroma High-end Apartment project—a 1-basement, 18-storey development with a gross floor area of 45,000 m² in Binh Duong New City—commenced in December 2010 and completed in August 2011, contributing to the premium housing supply and the urban development of Binh Duong.
EN VANG HIGH-QUALITY KINDERGARTEN – PRIMARY – SECONDARY – HIGH SCHOOL
EN VANG HIGH-QUALITY KINDERGARTEN – PRIMARY – SECONDARY – HIGH SCHOOL
Phuoc Thanh executed construction and finishing for Phase 2 of the Én Vàng High-Quality School – a 3-floor, 1,776 m² facility in Tay Ninh City; construction started in 11/2019 and was completed in 06/2020, delivering a spacious, modern learning environment for students.
CITRINE APARTMENT
CITRINE APARTMENT
Phuoc Thanh carried out the structural works of the Citrine Apartment – a 16-storey, 1-basement residential building with a total floor area of 25,000 m² in District 9, Ho Chi Minh City; commenced in 04/2018 and completed in 02/2019, contributing to the quality housing supply in East Saigon.
HOA PHUONG – ZEN TOWER APARTMENT – DISTRICT 12
HOA PHUONG – ZEN TOWER APARTMENT – DISTRICT 12
Phuoc Thanh executed the foundation, basement, and superstructure works for the Hoa Phuong – Zen Tower Apartment project—1 basement, 18 above-ground storeys, with a gross floor area of 54,000 m² in District 12, Ho Chi Minh City—commenced in July 2017 and completed in September 2018, contributing to the growth of the textile–garment sector and the local economy.
DAIRY FARMING AND MILK PROCESSING COMPLEX PROJECT
DAIRY FARMING AND MILK PROCESSING COMPLEX PROJECT
Phuoc Thanh executed the construction and M&E infrastructure of the Dairy Farming and Milk Processing Complex – a 2-storey, 59,658 m² facility in Hung Thuan Commune, Trang Bang Town, Tay Ninh; commenced in 04/2023 and completed in 08/2023, contributing to the growth of dairy farming and improving the livelihood of local residents.
CAI LAN VEGETABLE OIL – ACID HOUSE & WASTEWATER TREATMENT PLANT
CAI LAN VEGETABLE OIL – ACID HOUSE & WASTEWATER TREATMENT PLANT
Phuoc Thanh executed the acid storage and wastewater treatment facilities for Cai Lan Vegetable Oil Factory at Hiep Phuoc Industrial Park. The project was completed within 2 months, meeting high technical and safety standards.