
{"id":14325,"date":"2025-09-22T15:39:48","date_gmt":"2025-09-22T08:39:48","guid":{"rendered":"https:\/\/phuocthanh.vn\/?post_type=project&#038;p=14325"},"modified":"2025-09-22T15:47:00","modified_gmt":"2025-09-22T08:47:00","slug":"ccgrass-factory","status":"publish","type":"project","link":"https:\/\/phuocthanh.vn\/en\/project\/ccgrass-factory\/","title":{"rendered":"CCGRASS FACTORY"},"content":{"rendered":"<p data-start=\"137\" data-end=\"472\">The CCGRASS Factory Project is invested by <strong data-start=\"180\" data-end=\"230\">Cocreation Grass Corporation Vietnam Co., Ltd.<\/strong>, located in <strong data-start=\"243\" data-end=\"292\">Phuoc Dong Industrial Park, Tay Ninh Province<\/strong>.<br data-start=\"293\" data-end=\"296\" \/>The facility comprises <strong data-start=\"319\" data-end=\"332\">03 floors<\/strong> with a total construction floor area of <strong data-start=\"373\" data-end=\"387\">135,000 m\u00b2<\/strong>, including a synchronized system of production workshops and auxiliary facilities.<\/p>\n<p data-start=\"474\" data-end=\"796\"><strong data-start=\"474\" data-end=\"502\">Phuoc Thanh Construction<\/strong> serves as the <strong data-start=\"517\" data-end=\"536\">main contractor<\/strong>, undertaking the entire scope of structural works, construction, and finishing. The project commenced in <strong data-start=\"642\" data-end=\"654\">May 2024<\/strong> and is scheduled for completion in <strong data-start=\"690\" data-end=\"704\">March 2026<\/strong>, ensuring compliance with progress, quality, and technical standards set by the investor.<\/p>\n<p data-start=\"798\" data-end=\"978\">Upon operation, the project will contribute to the promotion of industrial production, generate employment opportunities, and enhance the economic value of <strong data-start=\"954\" data-end=\"975\">Tay Ninh Province<\/strong>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Phuoc Thanh Construction is the main contractor for the CCGRASS Factory Project \u2013 a 3-floor facility with a total floor area of 135,000 m\u00b2 at Phuoc Dong Industrial Park, Tay Ninh. The project commenced in May 2024 and will be completed in March 2026, contributing to local industrial development and economic growth.<\/p>\n","protected":false},"featured_media":14336,"template":"","meta":{"_acf_changed":false},"project-cat":[101,285],"project-year":[25],"project-status":[148],"project-location":[198,154],"class_list":["post-14325","project","type-project","status-publish","has-post-thumbnail","hentry","project-cat-projects","project-cat-industrial","project-year-25","project-status-the-project-is-under-construction","project-location-southern-project","project-location-tay-ninh-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project\/14325","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/media\/14336"}],"wp:attachment":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/media?parent=14325"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-cat?post=14325"},{"taxonomy":"project-year","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-year?post=14325"},{"taxonomy":"project-status","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-status?post=14325"},{"taxonomy":"project-location","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-location?post=14325"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}