
{"id":14267,"date":"2025-09-22T15:13:41","date_gmt":"2025-09-22T08:13:41","guid":{"rendered":"https:\/\/phuocthanh.vn\/?post_type=project&#038;p=14267"},"modified":"2025-09-24T10:07:46","modified_gmt":"2025-09-24T03:07:46","slug":"eagle-project-dong-nai-factory","status":"publish","type":"project","link":"https:\/\/phuocthanh.vn\/en\/project\/eagle-project-dong-nai-factory\/","title":{"rendered":"EAGLE PROJECT \u2013 DONG NAI FACTORY"},"content":{"rendered":"<p data-start=\"174\" data-end=\"352\">The Eagle \u2013 Dong Nai Factory Project, invested by Nestl\u00e9 Vietnam Co., Ltd., is located on 17A Street, Bien Hoa II Industrial Park, Bien Hoa City, Dong Nai Province.<\/p>\n<p data-start=\"354\" data-end=\"528\">The project consists of an industrial factory with a total construction floor area of <strong data-start=\"444\" data-end=\"457\">45,000 m\u00b2<\/strong>, covering structural works, finishing, and technical infrastructure.<\/p>\n<p data-start=\"530\" data-end=\"732\">Phuoc Thanh acted as the main contractor, undertaking full construction works from <strong data-start=\"617\" data-end=\"650\">October 2024 to December 2024<\/strong>, ensuring schedule, quality, and technical standards as required by the client.<\/p>\n<p data-start=\"734\" data-end=\"888\">The project contributes to expanding production capacity, meeting market demand, and promoting industrial and economic development in Dong Nai Province.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Phuoc Thanh executed the overall construction of the Eagle \u2013 Dong Nai Factory Project, an industrial facility with a total floor area of 45,000 m\u00b2 at Bien Hoa II Industrial Park, Dong Nai; commenced in 10\/2024 and completed in 12\/2024, contributing to enhanced production capacity and regional economic growth.<\/p>\n","protected":false},"featured_media":14703,"template":"","meta":{"_acf_changed":false},"project-cat":[285],"project-year":[25],"project-status":[150],"project-location":[157,198],"class_list":["post-14267","project","type-project","status-publish","has-post-thumbnail","hentry","project-cat-industrial","project-year-25","project-status-the-project-has-been-constructed","project-location-dong-nai-en","project-location-southern-project"],"acf":[],"_links":{"self":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project\/14267","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/media\/14703"}],"wp:attachment":[{"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/media?parent=14267"}],"wp:term":[{"taxonomy":"project-cat","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-cat?post=14267"},{"taxonomy":"project-year","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-year?post=14267"},{"taxonomy":"project-status","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-status?post=14267"},{"taxonomy":"project-location","embeddable":true,"href":"https:\/\/phuocthanh.vn\/en\/wp-json\/wp\/v2\/project-location?post=14267"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}