VINATEX BUILDING

  • Vị trí dự án Location: District 1, Ho Chi Minh City
  • Client Vietnam National Textile and Garment Group (Vinatex)
  • Package Structural works, M&E systems, fire protection, elevator installation, and shell & core finishing
  • Tổng diện tích sàn xây dựng (CFA) 13,442 m²
  • Implementation time June 2020 – December 2024
24
Storeys above ground
1
Basement level
Project information

The Vinatex Building project is invested by Vietnam National Textile and Garment Group (Vinatex) and is located in District 1, Ho Chi Minh City.

The development comprises 1 basement and 24 above-ground storeys with a total gross floor area of 13,442 m². It is designed as a modern office complex serving the Group’s management, research, and development operations.

In this project, Phuoc Thanh Construction undertakes the packages for structural works, mechanical & electrical (M&E) systems, fire protection (FPP), elevator installation, and shell & core finishing. Construction commenced in June 2020 and is scheduled for completion in December 2024. The works are executed to high technical standards, strictly complying with safety regulations and project timelines.

Upon commissioning, the building will become the strategic headquarters of Vietnam National Textile and Garment Group and a contemporary architectural landmark in the heart of Ho Chi Minh City.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.