VINAMILK TAY NINH DAIRY FARM

  • Vị trí dự án Long Thinh Hamlet, Long Khanh Commune, Ben Cau District, Tay Ninh Province
  • Client Vietnam Dairy Cow One Member Co., Ltd. (Vinamilk)
  • Package Technical infrastructure construction, power supply, lighting system
  • Implementation time March 2016 – March 2017
685
hecta
Project information

Vinamilk’s Tay Ninh Dairy Farm is one of the most modern and largest-scale dairy farms in Vietnam, often referred to as the “Dairy Cow Resort.” Located in Ben Cau District, Tay Ninh Province, the farm covers 685 hectares and raises over 8,000 dairy cows in a modern, well-ventilated environment that meets international animal welfare standards.

Phuoc Thanh was responsible for the construction of the entire technical infrastructure, including power supply and lighting systems, contributing to a fully integrated facility that supports Vinamilk in developing a high-tech dairy farming model aimed at clean and sustainable agriculture.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.