VINAMILK LAM DONG DAIRY FARM

  • Vị trí dự án Tutra Commune, Don Duong District, Lam Dong Province
  • Client Vietnam Dairy Products Joint Stock Company – Vinamilk
  • Package Construction of the entire Lam Dong dairy farm
  • Tổng diện tích sàn xây dựng (CFA) 93.100m²
  • Implementation time 08/2011 - 04/2012
93.100
m2
Project information

The Vinamilk Lam Dong Dairy Farm Project, invested by Vietnam Dairy Products Joint Stock Company – Vinamilk, is located in Tutra Commune, Don Duong District, Lam Dong Province.

The facility covers an area of 93,100 m² and includes the construction of a modern dairy farm.

Phuoc Thanh was responsible for the entire construction of the farm. The project commenced in August 2011 and was completed in April 2012. This project contributes to enhancing the production capacity of high-quality fresh milk, promoting dairy farming, and supporting agricultural economic development in Lam Dong.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.