TTC PLAZA DUC TRONG SHOPPING CENTRE

  • Vị trí dự án Duc Trong District, Lam Dong Province, Vietnam
  • Client Saigon Thuong Tin Real Estate Joint Stock Company (TTC Land)
  • Package General contractor for construction
  • Tổng diện tích sàn xây dựng (CFA) 10,000 m²
  • Implementation time May 2018 – March 2019
10 000
Project information

The TTC Plaza Duc Trong Shopping Centre is invested by Saigon Thuong Tin Real Estate Joint Stock Company (TTC Land) and is located in Duc Trong District, Lam Dong Province.

The development consists of 5 storeys with a total gross floor area of 10,000 m². It was built to create a modern retail centre that meets the shopping and service needs of the surrounding area.

In this project, Phuoc Thanh served as the general contractor for construction. Work commenced in May 2018 and was completed in March 2019. Construction was carried out in a coordinated manner, ensuring schedule compliance, quality, and the technical standards required by the investor.

Once in operation, the building has contributed to transforming the urban landscape of Duc Trong, promoting commercial and service development, and improving the quality of life for the local community.

Other projects

DESTINO CENTRO
DESTINO CENTRO
Phuoc Thanh Construction undertakes basement, ground floor structural works, finishing, MEPF systems, and landscape infrastructure for the Destino Centro – My Yen Project (20 floors, total floor area 149,912.85 m²) in Ben Luc, Long An; commenced in August 2024 and scheduled for completion in September 2026.
FIATO AIRPORT CITY
FIATO AIRPORT CITY
Phuoc Thanh Construction executes structural and finishing works for the Fiato Airport City Project (02 towers, 786 apartments, total floor area 68,773 m²) in Nhon Trach, Dong Nai; commenced in May 2024 and scheduled for completion in June 2026.
CELADON CITY (BLOCK A7, D & E)
CELADON CITY (BLOCK A7, D & E)
Phuoc Thanh carried out the construction and full finishing of Celadon City (Block A7, D & E) – comprising 01 basement and 12 above-ground floors, with a total floor area of 120,000 m² in Tan Phu District, Ho Chi Minh City; commenced in 02/2016 and completed in 04/2018.
SAIGON-AVENUE
SAIGON-AVENUE
Phuoc Thanh carried out the construction of the foundation, basement, and superstructure for the Saigon Avenue project – comprising 01 basement, 26 above-ground floors, and a total floor area of 46,200 m² in Thu Duc District, Ho Chi Minh City; commenced in 02/2018 and completed in 01/2019.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.