SAIGON BEER – CU CHI BREWERY

  • Vị trí dự án Northwest Industrial Park, Cu Chi District, Ho Chi Minh City
  • Client Saigon Beer – Alcohol – Beverage Corporation (SABECO)
  • Package Construction, finishing, MEP systems
  • Tổng diện tích sàn xây dựng (CFA) 50.000 m2
  • Implementation time November 2013 – April 2014
50.000
m2
Project information

The “Premium Beer Production Equipment Investment Project” at Saigon Beer – Cu Chi Brewery is an expansion and upgrade of the production line for Saigon Beer – Alcohol – Beverage Corporation (SABECO) to meet the growing demand for premium beer products.

Phuoc Thanh served as the main contractor, executing the entire scope of construction, finishing, and MEP systems for a total floor area of 50,000 m², ensuring strict compliance with technical standards and food safety requirements in beer production.

This project plays a crucial role in SABECO’s strategy to develop new premium products and enhance production capacity in Southern Vietnam.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.