PHUC DAT TOWER

  • Vị trí dự án 32 National Highway 1K, Dong Hoa, Binh Duong
  • Client Phuc Dat Connect 2 Co., Ltd.
  • Package General Contractor for construction (basement structure – superstructure – finishing and MEP)
  • Tổng diện tích sàn xây dựng (CFA) 81.423m²
  • Implementation time 06/2021 – 06/2023
30
Above-ground floors
02
Basement
724
Apartments
Project information

Phuc Dat Tower is a mixed-use development comprising high-end residential apartments, commercial, service, office, shophouse, and officetel units, invested by Phuc Dat Production and Trading Co., Ltd.
The project is located on the frontage of National Highway 1K, at the new address: 159 National Highway 1K, Dong Hoa Ward, Ho Chi Minh City.

With a total land area of 6,031.2 m², the development is planned into two 30-storey blocks, offering 724 apartments of various sizes to the market.

Phuc Dat Tower introduces a new lifestyle concept, redefining traditional perceptions of confined and rigid apartment spaces. With flexible design solutions and the integration of natural green elements into the architectural structure, the project creates a healthier and more open living environment.

On a land scale of over 6,000 m², Phuc Dat Tower in Binh Duong is designed with 2 blocks of 30 storeys, delivering 724 apartments with diverse layouts and sizes, including:

  • 1-Bedroom Units: 53.3 m²

  • 2-Bedroom Units: 59.9 m² – 72 m²

  • 3-Bedroom Units: 77.2 m² – 87.4 m²

  • Penthouse Units: 130.4 m² – 141.1 m²

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.