PACKAGE CM-PW-1.4: LIA4 UPGRADING PROJECT – CA MAU

  • Vị trí dự án Ward 4 & Ward 9, Ca Mau City
  • Client Ca Mau Urban Upgrading Project Management Unit
  • Package Construction of technical infrastructure and transportation system
  • Implementation time 07/2015 – 05/2016
Project information

The LIA4 Upgrading Project – Ca Mau (Package CM-PW-1.4) is part of the Urban Upgrading and Development Program of Ca Mau City, invested by the Ca Mau Urban Upgrading Project Management Unit.

Phuoc Thanh executed the technical infrastructure works, upgrading the transportation system, and improving living conditions for residents in Ward 4 and Ward 9, Ca Mau City. The main scope of works included road rehabilitation, water supply and drainage systems, and supporting infrastructure, contributing to urban transformation and sustainable development for the low-income residential area (LIA4).

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.