OSIMI PHU MY APARTMENT COMPLEX

  • Vị trí dự án Corner of Nguyen Trai Street and Truong Dinh Street, Phu My Town, Tan Thanh District, Ba Ria – Vung Tau Province
  • Client ANI Joint Stock Company
  • Package Construction of basement structure, superstructure, and finishing works
  • Tổng diện tích sàn xây dựng (CFA) 50.600m²
  • Implementation time October 2020 – January 2022
18
Stories
01
Basement
642
Apartments
Project information

The OSIMI PHU MY APARTMENT COMPLEX, invested by ANI Joint Stock Company and developed/distributed by Dat Xanh Premium, has a total land area of approximately 5,990.6 m².

  • Podium construction land area: 3,243.6 m² (building density: 54.2%)

  • Tower construction land area: 2,596 m² (building density: 43.3%)

  • Total construction floor area (excluding basement): 45,039.3 m²

The project comprises 3 residential blocks, each 18 stories high with 1 basement, providing a total of 642 apartments. The units are designed with 1–2 bedrooms, ranging in size from 49 m² to 70 m².

The internal facilities include: a 200 m² infinity swimming pool, the Moonlight Square, a mini supermarket, the Vesta Fountain, a fitness and wellness center (gym & yoga), and a children’s playground, among others.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.