HFIC COMMERCIAL – SERVICE OFFICE HEADQUARTERS

  • Vị trí dự án 33 – 35 – 37 – 39 Pasteur Street, District 1, Ho Chi Minh City
  • Client Ho Chi Minh City State Financial Investment Company (HFIC)
  • Package Construction Contractor
  • Tổng diện tích sàn xây dựng (CFA) 7,500 m²
  • Implementation time 07/2025 – Q4/2026
14
above-ground floors
3
basements
7.500
Project information

The HFIC Commercial – Service Office Headquarters is located at 33 – 35 – 37 – 39 Pasteur Street, District 1, Ho Chi Minh City, developed with a scale of 14 above-ground floors and 3 basements.

The project features a modern design harmonized with the central urban landscape, meeting green architecture standards, ensuring energy efficiency, and aiming to become a key foundation in the development of financial technology infrastructure in Ho Chi Minh City.

As the Construction Contractor, Phuoc Thanh commits to implementing the project with a skilled engineering and workforce team, modern equipment, and advanced construction technologies, ensuring schedule – quality – safety.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.