GREENFEED ANIMAL FEED & VETERINARY PRODUCT R&D CENTER

  • Vị trí dự án Phuc Long Industrial Park, Ben Luc District, Long An Province
  • Client Greenfeed Vietnam Corporation
  • Package Basic construction and external infrastructure works
  • Tổng diện tích sàn xây dựng (CFA) 2.152 m²
  • Implementation time 06/2022 – 11/2022
2.152
m2
Project information

The GREENFEED Animal Feed & Veterinary Product Research and Development Center, invested by Greenfeed Vietnam Corporation, is located in Phuc Long Industrial Park, Ben Luc District, Long An Province. The project comprises a single-storey facility with a total gross floor area of 2,152 m², designed and constructed to support research, development, and quality control of animal feed and veterinary products.

Phuoc Thanh undertook the package covering basic construction and external infrastructure, with works commencing in June 2022 and completed in November 2022. Throughout the implementation, Phuoc Thanh applied advanced construction standards, modern methodologies, and stringent quality management to ensure timely delivery, safety, and compliance with the client’s requirements.

The commissioning of this center enhances R&D capacity, facilitates the development of new products, and contributes to the sustainable growth of the animal feed and veterinary sector in Vietnam.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation