FORMOSA BIOCHEMICAL WASTEWATER TREATMENT PLANT

  • Vị trí dự án Vung Ang Industrial Zone, Ky Long Ward, Ky Anh Town, Ha Tinh Province
  • Client Hung Nghiep Formosa Ha Tinh Steel Corporation (FHS)
  • Package Construction and execution of the wastewater treatment tank
  • Tổng diện tích sàn xây dựng (CFA) 30,000 m²
  • Implementation time 03/2015 – 06/2015
30.000
Project information

The Formosa Ha Tinh Biochemical Wastewater Treatment Tank Project is a critical environmental infrastructure facility constructed by Phuoc Thanh for Hung Nghiep Formosa Ha Tinh Steel Corporation (FHS).

The project covers a total area of 30,000 m², located in the Vung Ang Economic Zone, Ha Tinh Province – a key industrial hub in Northern Vietnam. The scope of work includes the construction of the biochemical wastewater treatment tank, meeting stringent technical requirements for environmental protection and industrial operation.

This project contributes to completing the wastewater treatment system of the Formosa steel plant, ensuring safe operation and compliance with environmental protection standards within the large-scale steel production complex.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.