FORMOSA BIOCHEMICAL WASTEWATER TREATMENT PLANT

  • Vị trí dự án Vung Ang Industrial Zone, Ky Long Ward, Ky Anh Town, Ha Tinh Province
  • Client Hung Nghiep Formosa Ha Tinh Steel Corporation (FHS)
  • Package Construction and execution of the wastewater treatment tank
  • Tổng diện tích sàn xây dựng (CFA) 30,000 m²
  • Implementation time 03/2015 – 06/2015
30.000
Project information

The Formosa Ha Tinh Biochemical Wastewater Treatment Tank Project is a critical environmental infrastructure facility constructed by Phuoc Thanh for Hung Nghiep Formosa Ha Tinh Steel Corporation (FHS).

The project covers a total area of 30,000 m², located in the Vung Ang Economic Zone, Ha Tinh Province – a key industrial hub in Northern Vietnam. The scope of work includes the construction of the biochemical wastewater treatment tank, meeting stringent technical requirements for environmental protection and industrial operation.

This project contributes to completing the wastewater treatment system of the Formosa steel plant, ensuring safe operation and compliance with environmental protection standards within the large-scale steel production complex.

Other projects

RICCA RESIDENTIAL COMPLEX
RICCA RESIDENTIAL COMPLEX
Phuoc Thanh, as D&B general contractor, executed construction, finishing, and full M&E works for the Ricca Residential Complex—one basement and eighteen floors above ground, total area 52,010 m²—located in Phu Huu Ward, District 9, Ho Chi Minh City; commenced in December 2019 and completed in September 2021, enhancing housing infrastructure and creating a new benchmark for urban living in the city’s eastern corridor.
MASTERI TRINITY SQUARE – LUXURY APARTMENT COMPLEX
MASTERI TRINITY SQUARE – LUXURY APARTMENT COMPLEX
Phuoc Thanh Construction is the general contractor for the Masteri Trinity Square Project – comprising 03 towers of 27 floors, 02 basements, and a total floor area of 182,649 m² in Hung Yen. Construction began in November 2024 and is expected to be completed in May 2027, creating a premium and modern residential space.
HEADQUARTERS OFFICE BUILDING OF EVNGENCO3
HEADQUARTERS OFFICE BUILDING OF EVNGENCO3
Phuoc Thanh is constructing the HEADQUARTERS OFFICE BUILDING OF EVNGENCO3 – a project with 2 basements, 18 above-ground floors, and a total floor area of 16,332.42 m² in Thu Duc City. Construction starts in May 2025 and is expected to be completed in December 2027, strengthening EVNGENCO3’s management and operational capacity.
KHAI HOAN PRIME
KHAI HOAN PRIME
Phuoc Thanh is the General Contractor for structural works and finishing of the KHAI HOAN PRIME project – 3 towers up to 27 floors with 1,296 apartments, developed by Khai Hoan Land Group in South Saigon.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.