  • Implementation time 05/2024 – 06/2026
68.773
m2
02
Basements
18
Floors
786
Apartments
Project information

The Fiato Airport City Project in Nhon Trach, Dong Nai, invested by Thang Long Hiep Phuoc Co., Ltd., consists of two 18-storey towers with 02 basements, providing a total of 786 modern apartments.

Phuoc Thanh Construction undertakes the role of structural works and finishing contractor, with a total construction floor area of 68,773 m².

The project commenced in May 2024 and is expected to be completed in June 2026, promising to deliver a comfortable and high-quality living space for local residents.

Other projects

RICCA RESIDENTIAL COMPLEX
RICCA RESIDENTIAL COMPLEX
Phuoc Thanh, as D&B general contractor, executed construction, finishing, and full M&E works for the Ricca Residential Complex—one basement and eighteen floors above ground, total area 52,010 m²—located in Phu Huu Ward, District 9, Ho Chi Minh City; commenced in December 2019 and completed in September 2021, enhancing housing infrastructure and creating a new benchmark for urban living in the city’s eastern corridor.
MASTERI TRINITY SQUARE – LUXURY APARTMENT COMPLEX
MASTERI TRINITY SQUARE – LUXURY APARTMENT COMPLEX
Phuoc Thanh Construction is the general contractor for the Masteri Trinity Square Project – comprising 03 towers of 27 floors, 02 basements, and a total floor area of 182,649 m² in Hung Yen. Construction began in November 2024 and is expected to be completed in May 2027, creating a premium and modern residential space.
HEADQUARTERS OFFICE BUILDING OF EVNGENCO3
HEADQUARTERS OFFICE BUILDING OF EVNGENCO3
Phuoc Thanh is constructing the HEADQUARTERS OFFICE BUILDING OF EVNGENCO3 – a project with 2 basements, 18 above-ground floors, and a total floor area of 16,332.42 m² in Thu Duc City. Construction starts in May 2025 and is expected to be completed in December 2027, strengthening EVNGENCO3’s management and operational capacity.
KHAI HOAN PRIME
KHAI HOAN PRIME
Phuoc Thanh is the General Contractor for structural works and finishing of the KHAI HOAN PRIME project – 3 towers up to 27 floors with 1,296 apartments, developed by Khai Hoan Land Group in South Saigon.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.