C.P DONG NAI FERTILIZER PLANT

  • Vị trí dự án Bau Xeo Industrial Park, Song Trau Commune, Trang Bom District, Dong Nai Province
  • Client C.P. Vietnam Corporation
  • Package Construction work for factory, drainage, internal road, electrical system for factory, truck scale, fire fighting system
  • Tổng diện tích sàn xây dựng (CFA) 60.000 m2
  • Implementation time 07/2015 - 05/2016
60.000
m2
Project information

The C.P DONG NAI FERTILIZER PLANT is a modern production complex with an annual capacity of up to 9,500 tons, including organic fertilizers, bio-fertilizers, and microbial fertilizers. Located in Bau Xeo Industrial Park, Dong Nai Province, the project was undertaken by Phước Thành in the role of General Contractor.

Key construction works include the new main factory building, stormwater drainage system, internal roads, electrical system, electronic weighing station, and fire protection system. With a total floor area of 60,000 m², this facility stands as one of the largest fertilizer plants in the region, contributing to C.P. Vietnam’s sustainable agricultural value chain in Southern Vietnam.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.