CITYMARK RESIDENCE

  • Vị trí dự án Phu My Ward, Phu My Town, Ba Ria – Vung Tau Province
  • Client Tung My Trading Co., Ltd.
  • Package Main contractor (foundation, basements, and superstructure works)
  • Tổng diện tích sàn xây dựng (CFA) 132,321 m²
  • Implementation time 02/2023 – Estimated 05/2026
25
Floors
02
Basements
02
Towers
1.248
Apartments
55
Shophouses
Project information

The Citymark Residence project is developed by Tung My Trading Co., Ltd., located in Phu My Ward, Phu My Town, Ba Ria – Vung Tau Province.

The development consists of 02 basement levels and 25 above-ground floors, with a total floor area of 132,321 m².

Phuoc Thanh serves as the main contractor, responsible for constructing the foundation, basements, and structural works of the superstructure. The project commenced in February 2023 and is expected to be completed in May 2026, with a strong commitment to meeting schedule and quality standards.

The project is expected to become a key architectural landmark, contributing to improved infrastructure and creating a modern living space in the Phu My area.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.