CHARM RESORT

  • Vị trí dự án Long Hai Town, Long Dien District, Ba Ria – Vung Tau Province
  • Client Phuc Dat Hotel Tourism Co., Ltd.
  • Package Construction and Finishing Works
  • Tổng diện tích sàn xây dựng (CFA) 94.417m2
  • Implementation time 05/2022 – 03/2023
972
Tourist Apartments
24
Resort Villas
17
Shophouses
1
Basement Floor
13
Above-Ground Floors
Project information

The Charm Hotel project, invested by Phuc Dat Hotel Tourism Co., Ltd., is located in Long Hai Town, Long Dien District, Ba Ria – Vung Tau Province.

The development features one basement and 13 above-ground floors, with a total floor area of 94,417 m², including a high-rise hotel and a full range of premium service facilities.

Phuoc Thanh undertook construction and finishing works from May 2022 to March 2023, delivering on schedule, with high quality and in line with the investor’s technical standards.

This project contributes to improving luxury hospitality services in Long Hai, promoting local seaside tourism and economic growth.

Other projects

SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
SAILUN VIETNAM FACTORY EXPANSION – PHASE 2 & PHASE 3
Phuoc Thanh executed construction, finishing, and MEP works for the Sailun Vietnam Factory Expansion – Phase 2 & Phase 3, a 1-storey building with a total floor area of 98,000 m² in Go Dau, Tay Ninh; commenced in 02/2021 and completed in 07/2023, contributing to enhancing tire production and export capacity in Vietnam.
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
RADIAN JINYU (VIETNAM) TIRE FACTORY – PHASE 1
Phuoc Thanh executed construction, finishing, and MEP works for the Radian Jinyu (Vietnam) Tire Factory – Phase 1, a 2-storey building with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh; commenced in 06/2020 and completed in 11/2020, meeting technical standards and schedule, contributing to the enhancement of local industrial production capacity.
JINYU TIRE FACTORY
JINYU TIRE FACTORY
Phuoc Thanh acted as the general contractor for construction, finishing, and MEP works of the JINYU TIRE Factory – a 2-storey project with a total floor area of 19,250 m² at Phuoc Dong Industrial Park, Tay Ninh, commenced in 06/2020 and completed in 11/2020.
HAILIDE VIETNAM FABRIC WORKSHOP
HAILIDE VIETNAM FABRIC WORKSHOP
Hailide Vietnam Fabric Workshop – a 74,588 m² civil construction project in Phuoc Dong Industrial Park, Tay Ninh, executed by Phuoc Thanh, including functional buildings and synchronized infrastructure.