ACID BUILDING & WASTEWATER TREATMENT FACTORY – CAI LAN FACTORY

  • Vị trí dự án Nha Be District, Ho Chi Minh City
  • Client Cai Lan Vegetable Oil Co., Ltd.
  • Package Construction of Acid Building and wastewater treatment workshops
  • Tổng diện tích sàn xây dựng (CFA) 1,100 m²
  • Implementation time 02/2016 – 04/2016
1,100
Project information

The Acid Building and Wastewater Treatment Workshop Project at Cai Lan Factory is located in Hiep Phuoc Industrial Park, Nha Be District, Ho Chi Minh City.

Phuoc Thanh executed the construction of a 2-storey Acid Building and a wastewater treatment workshop with a total construction floor area of 1,100 m², serving the vegetable oil production process and ensuring compliance with environmental treatment standards.

The project contributes to completing the closed-loop operation system of the factory, ensuring chemical safety and environmental protection in accordance with current regulations.

Other projects

GREENFEED ANIMAL FEED & VETERINARY PRODUCT R&D CENTER
GREENFEED ANIMAL FEED & VETERINARY PRODUCT R&D CENTER
Phuoc Thanh executed the basic construction and external infrastructure of the GREENFEED Animal Feed & Veterinary Product R&D Center – a 1-storey, 2,152 m² facility in Phuc Long Industrial Park, Long An; commenced in 06/2022 and completed in 11/2022, strengthening R&D capacity and supporting the sustainable development of Vietnam’s animal feed and veterinary industry.
VINATEX BUILDING
VINATEX BUILDING
Phuoc Thanh executes the structural, M&E, fire protection, elevator, and shell & core finishing works for Vinatex Building—a 24-storey, 1-basement office complex with a gross floor area of 13,442 m² in District 1, Ho Chi Minh City—commenced in June 2020 and scheduled for completion in December 2024, set to become a modern headquarters and architectural highlight of the city centre.
GREEN RIVER APARTMENTS – HUNG PHAT
GREEN RIVER APARTMENTS – HUNG PHAT
Phuoc Thanh acted as the D&B general contractor for the Green River project – a 20-story building with 2 basement levels and a total area of 198,181 m² in District 8, Ho Chi Minh City. Construction began in March 2017 and was completed in December 2020, delivering a modern living environment and supporting the urban growth of western Ho Chi Minh City.
THE SUMMIT APARTMENT – DA NANG
THE SUMMIT APARTMENT – DA NANG
The Summit – Da Nang project, invested by Dat Kinh Tuyen No. 1 Co., Ltd., is located in Son Tra District with a scale of 1 basement floor, 20 above-ground floors, and a total floor area of 43,000 m². Phuoc Thanh constructed the main structure, delivering on time and to technical standards, contributing to the supply of premium apartments and the development of Da Nang’s urban infrastructure.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.