VIETNAM ZIRCONIUM COMPOUND MANUFACTURING PLANT – PHASE 1

  • Vị trí dự án Cai Mep Industrial Park, Tan Thanh District, Ba Ria – Vung Tau Province
  • Client Vietnam Rare Chemicals Joint Stock Company
  • Package Construction of the Manufacturing Plant
  • Tổng diện tích sàn xây dựng (CFA) 40.000m²
  • Implementation time 06/2013 – 02/2014
40.000
m2
Project information

The Vietnam Zirconium Compound Manufacturing Plant – Phase 1, invested by Vietnam Rare Chemicals Joint Stock Company, is located at Cai Mep Industrial Park, Tan Thanh District, Ba Ria – Vung Tau Province. The project covers a total construction floor area of 40,000 m².

Phuoc Thanh was responsible for the complete construction of the manufacturing plant. The project commenced in June 2013 and was completed in February 2014.

This project not only enhances domestic zircon deep-processing capacity but also marks an important cooperation between Vietnam and Japan in the rare chemicals sector, laying a foundation for sustainable industrial development in Ba Ria – Vung Tau.

Other projects

RICCA RESIDENTIAL COMPLEX
RICCA RESIDENTIAL COMPLEX
Phuoc Thanh, as D&B general contractor, executed construction, finishing, and full M&E works for the Ricca Residential Complex—one basement and eighteen floors above ground, total area 52,010 m²—located in Phu Huu Ward, District 9, Ho Chi Minh City; commenced in December 2019 and completed in September 2021, enhancing housing infrastructure and creating a new benchmark for urban living in the city’s eastern corridor.
MASTERI TRINITY SQUARE – LUXURY APARTMENT COMPLEX
MASTERI TRINITY SQUARE – LUXURY APARTMENT COMPLEX
Phuoc Thanh Construction is the general contractor for the Masteri Trinity Square Project – comprising 03 towers of 27 floors, 02 basements, and a total floor area of 182,649 m² in Hung Yen. Construction began in November 2024 and is expected to be completed in May 2027, creating a premium and modern residential space.
HEADQUARTERS OFFICE BUILDING OF EVNGENCO3
HEADQUARTERS OFFICE BUILDING OF EVNGENCO3
Phuoc Thanh is constructing the HEADQUARTERS OFFICE BUILDING OF EVNGENCO3 – a project with 2 basements, 18 above-ground floors, and a total floor area of 16,332.42 m² in Thu Duc City. Construction starts in May 2025 and is expected to be completed in December 2027, strengthening EVNGENCO3’s management and operational capacity.
KHAI HOAN PRIME
KHAI HOAN PRIME
Phuoc Thanh is the General Contractor for structural works and finishing of the KHAI HOAN PRIME project – 3 towers up to 27 floors with 1,296 apartments, developed by Khai Hoan Land Group in South Saigon.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.