VINATEX BUILDING

  • Vị trí dự án Location: District 1, Ho Chi Minh City
  • Client Vietnam National Textile and Garment Group (Vinatex)
  • Package Structural works, M&E systems, fire protection, elevator installation, and shell & core finishing
  • Tổng diện tích sàn xây dựng (CFA) 13,442 m²
  • Implementation time June 2020 – December 2024
24
Storeys above ground
1
Basement level
Project information

The Vinatex Building project is invested by Vietnam National Textile and Garment Group (Vinatex) and is located in District 1, Ho Chi Minh City.

The development comprises 1 basement and 24 above-ground storeys with a total gross floor area of 13,442 m². It is designed as a modern office complex serving the Group’s management, research, and development operations.

In this project, Phuoc Thanh Construction undertakes the packages for structural works, mechanical & electrical (M&E) systems, fire protection (FPP), elevator installation, and shell & core finishing. Construction commenced in June 2020 and is scheduled for completion in December 2024. The works are executed to high technical standards, strictly complying with safety regulations and project timelines.

Upon commissioning, the building will become the strategic headquarters of Vietnam National Textile and Garment Group and a contemporary architectural landmark in the heart of Ho Chi Minh City.

Other projects

DESTINO CENTRO
DESTINO CENTRO
Phuoc Thanh Construction undertakes basement, ground floor structural works, finishing, MEPF systems, and landscape infrastructure for the Destino Centro – My Yen Project (20 floors, total floor area 149,912.85 m²) in Ben Luc, Long An; commenced in August 2024 and scheduled for completion in September 2026.
FIATO AIRPORT CITY
FIATO AIRPORT CITY
Phuoc Thanh Construction executes structural and finishing works for the Fiato Airport City Project (02 towers, 786 apartments, total floor area 68,773 m²) in Nhon Trach, Dong Nai; commenced in May 2024 and scheduled for completion in June 2026.
CELADON CITY (BLOCK A7, D & E)
CELADON CITY (BLOCK A7, D & E)
Phuoc Thanh carried out the construction and full finishing of Celadon City (Block A7, D & E) – comprising 01 basement and 12 above-ground floors, with a total floor area of 120,000 m² in Tan Phu District, Ho Chi Minh City; commenced in 02/2016 and completed in 04/2018.
TTC PLAZA DUC TRONG SHOPPING CENTRE
TTC PLAZA DUC TRONG SHOPPING CENTRE
Phuoc Thanh acted as general contractor for the TTC Plaza Duc Trong Shopping Centre—a 5-storey commercial building with a floor area of 10,000 m² in Duc Trong District, Lam Dong Province—commenced in May 2018 and completed in March 2019, contributing to the growth of commerce and services while enhancing the local urban landscape.