ACID BUILDING & WASTEWATER TREATMENT FACTORY – CAI LAN FACTORY

  • Vị trí dự án Nha Be District, Ho Chi Minh City
  • Client Cai Lan Vegetable Oil Co., Ltd.
  • Package Construction of Acid Building and wastewater treatment workshops
  • Tổng diện tích sàn xây dựng (CFA) 1,100 m²
  • Implementation time 02/2016 – 04/2016
1,100
Project information

The Acid Building and Wastewater Treatment Workshop Project at Cai Lan Factory is located in Hiep Phuoc Industrial Park, Nha Be District, Ho Chi Minh City.

Phuoc Thanh executed the construction of a 2-storey Acid Building and a wastewater treatment workshop with a total construction floor area of 1,100 m², serving the vegetable oil production process and ensuring compliance with environmental treatment standards.

The project contributes to completing the closed-loop operation system of the factory, ensuring chemical safety and environmental protection in accordance with current regulations.

Other projects

EXIM – PARK RIVERSIDE RESIDENTIAL AREA
EXIM – PARK RIVERSIDE RESIDENTIAL AREA
Phuoc Thanh executed the construction and finishing of the EXIM – Park Riverside Residential Area – a 3-floor project with a total floor area of 10,588 m² in Phu Huu Ward, Thu Duc City; commenced in 06/2016 and completed in 09/2016, bringing modern living spaces and adding value to the urban area in East HCMC
CAU KIEU LANDSCAPE ARCHITECTURE & LIGHTING PROJECT
CAU KIEU LANDSCAPE ARCHITECTURE & LIGHTING PROJECT
Phuoc Thanh executed the landscape architecture and artistic lighting works for Cau Kieu, District 1 – Ho Chi Minh City; construction commenced in April 2014 and was completed in October 2014, contributing to urban landscape enhancement and the modernisation of the city centre.
VINAMILK LAM DONG DAIRY FARM
VINAMILK LAM DONG DAIRY FARM
Phuoc Thanh executed the full construction of the Vinamilk Lam Dong Dairy Farm – a facility covering 93,100 m² in Tutra Commune, Don Duong District; commenced in August 2011 and completed in April 2012.
C.P DONG NAI FACTORY
C.P DONG NAI FACTORY
Phuoc Thanh constructed the factory, infrastructure, and fire protection system for the C.P Dong Nai Organic Fertilizer Factory – a 2-storey facility with a total floor area of 60,000 m² located in Bau Xeo Industrial Park, Trang Bom. The project started in May 2019 and was completed in November 2019.
Request a Consultation

    Please fill out the form below, and the Phuoc Thanh team will respond to your email as soon as possible.