The Formosa Ha Tinh Biochemical Wastewater Treatment Tank Project is a critical environmental infrastructure facility constructed by Phuoc Thanh for Hung Nghiep Formosa Ha Tinh Steel Corporation (FHS).
The project covers a total area of 30,000 m², located in the Vung Ang Economic Zone, Ha Tinh Province – a key industrial hub in Northern Vietnam. The scope of work includes the construction of the biochemical wastewater treatment tank, meeting stringent technical requirements for environmental protection and industrial operation.
This project contributes to completing the wastewater treatment system of the Formosa steel plant, ensuring safe operation and compliance with environmental protection standards within the large-scale steel production complex.